answer the questions on the case study that i have uploaded (Danone: Talent Management in Asia )
June 10, 2020
Topic: The Representation of Women and the Use of Folklore Dance in Kuwaiti Films B-check the reading list and their bibliography, you will have to su
June 10, 2020

CONSULTING SERVICES

1A. YOU HAVE PROVIDED CONSULTING SERVICES FOR A CLIENT DURING THE
PAST 10 YEARS. THE CLIENT WOULD REALLY LIKE TO GIVE YOU A 5-DAY
ALL EXPENSES PAID TRIP TO LAS VEGAS TO SHOW THEIR APPRECIATION
FOR YOUR EFFORTS IN GETTING THEM OUT OF THEIR MOST RECENT
LAWSUIT. IS IT ETHICAL TO ACCEPT THIS TRIP?

(5) YES

NO

1B. UNDER WHAT CIRCUMSTANCES WOULD IT BE ETHICAL FOR YOU TO ACCEPT
(5) THIS TYPE OF GIFT:_________________________________________________

________________________________________________________ _________

1C. IS IT ETHICAL TO TAKE THE BODY LOTION OUT OF THE HOTEL FOR YOUR
PERSONAL USE AT HOME:

(5) YES

NO

2. THE COST AND SCHEDULE ESTIMATE FOR A PROJECT SHOULD BE DEVELOPED
STARTING IN THE _________________________ STAGE?

(10) FEASIBILITY

PREPARATION OF DRAWINGS

REVIEW OF THE FINAL CONTRACT DOCUMENTS
3. WHAT ARE THREE BASIC ELEMENTS ON A SET OF CONTRACT DRAWINGS?
PLAN SHEETS:

(10) __________________________________________________________
__________________________________________________________
__________________________________________________________

CROSS-SECTIONS
(10) __________________________________________________________
__________________________________________________________
__________________________________________________________
4. CAREFULLY ILLUSTRATE THE DESIGN/CONSTRUCTION MANAGER CONTRACT
MODEL DESCRIBED AND ILLUSTRATED

5. LIST THE FIVE STAGES IN A PROJECT:
(20) _______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________

6. ON DRAWINGS, YOU SHOULD ____________USE A DESCRIPTIVE SCALE SUCH AS
1 IN. = 10 FT ALONE
(10)
NEVER ALWAYS

SOMETIMES OCCASIONALLY
-3-

CE 3361 PROJECT III FALL 2016

7. LIST THE OVERALL PROCEDURES USED TO DEVELOP AN ENGINEERING COST
ESTIMATE AND SCHEDULE
(20)
____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________

8. ISU HAS DECIDED TO CONSTRUCT A NEW ENGINEERING LAB. THE
BUILDING HAS THE FOLLOWING CHARACTERISTICS;
BUILDING PLAN: 40 FT X 80 FT
BASEMENT EXCAVATION DEPTH: 10 FT
SUPPORTED VERTICAL SLOPES ON ALL SIDES

PLAN
N
100 FT

50 FT
EXCAVATED AREA

80 FT CROSS-SECTION

10 FT
100 FT

-4-
CE 3361 PROJECT III
8A. THE TOTAL VOLUME THE EXCAVATION IS MOST NEARLY?

(30) A. 1,550 YD3
B. 1,850 YD3
C. 2,150 YD3
D. 7,214 YD3

8B. ACTIVITY SEQUENCE LIST OF ACTIVITIES

ACTIVITY
NUMBER ACTIVITY
DESCRIPTION
1
MOBILIZATION

4

(20) PLACE ACTIVITIES IN APPROPRIATE CONSTRUCTION SEQUENCE

8C. COST/SCHEDULE ESTIMATE

FILL IN THE COMPLETE COST/SCHEDULE ESTIMATE
WHERE APPROPRIATE USE THE MEANS ESTIMATING HANDBOOK SHEETS
PROVIDED SEPARATELY IN MOODLE

ACTIVITY
NUMBER UNIT QUANTITY UNIT
COST TOTAL
COST UNIT
TIME DURATION
LS 1 50,000 50,000 14 14 DAYS
2 EA 1 228 228 4 1 DAY
AC 1.2
AC 1.2
CY 90 2.00
6 CY 1040

ESTIMATED COST:_____________ USD

ESTIMATED DURATION:_____________DAYS

-5-
CE 3361 PROJECT III

8D. CONSTRUCT A SEQUENTIAL BAR CHART SCHEDULE OF THE SIX
CONSTRUCTION ACTIVITIES. SUBMIT AS A SEPARATE DIAGRAM.
USE THE FOLLOWING FORMAT. THIS IS AN ONLY AN EXAMPLE NOT THE
ANSWER TO QUESTION 8D.
ACTIVITY TIME (CALENDAR DAYS)
M T W T F S S M T W T F S S M
HOLDING WALLS
SHRUBS

USE LONG DIMENSION OF SHEET(S).

8E. HOW MUCH SHOULD ISU HAVE TO PAY FOR THIS PORTION OF THE PROJECT?
(20) A. $220,000
B. $225,000
C. $235,000
D. $240,000