Earnings and Benefits of Contingent and Noncontingent Workers
June 12, 2020
Week 4 Discussion Prompt 2 Instructor Meade Email this Author 11/24/2015 7:46:23 AM
June 12, 2020

App Design and launch

my project topic is : App Design and launch
in the PDF file all the instructions
in the PowerPoint it shows how the work should be.
the project should be step by step please and most of the work is gonna be in chart

Assignment 1 Sheet
Assignment Name: Individual Assignment
Week Number: As Stated in Critical Path
Contact: Instructor via Blackboard Mail
Due Date: As Stated in Critical Path
Learning Outcomes
1. Define the project scope.
2. Establish project priorities.
3. Create Work Breakdown Structure.
4. Develop responsibility matrix.
5. Develop project communication plan
Instructions
The first step would be to research and select a project.
To ensure no topic duplication, use the course website “Discussions” function to post your chosen topic. Please
note that no topic duplication will be allowed.
You will submit your assignment through the blackboard in PDF format.
Your assignment must be structured as follow:
1. Cover Page
The cover page should include the name of the selected project as well as your full name
2. The project scope checklist and priority
You might have to use some assumptions to finalize the project scope checklist. These assumptions should be
logical.
3. Work Breakdown Structure to your selected project
The WBS should include at least major deliverables, deliverables, cost account and work packages
4. Responsibility Matrix
Use functions and/or functional positions instead of names.
5. Communication plan
A table with all project communications.
Why would I use it / Why not?
You can use the text book formats for responsibility matrix and communication plan book but not the same
information
Tips And Hints
Remember: The aim is to share your own experience and cite your work. Think of yourselves as a consultant for
the manager who is unable to make a decision. You will only be paid for your services (in grades!) If you can
resolve the issue for your client. Hence be professional, precise and diligent.
Resources
This assignment means you have to do some research using the internet and library resources
Evaluation
Your project will be evaluated for creativity, thoroughness of research, and quality of written communications.
The grade awarded will be based on apparent level of effort, thoroughness, completeness, focus, and how well the
student demonstrated his/her understanding of the chosen product. Make sure you properly cite your sources.
Due to the time limit (5 minutes only), you might have to go through the most important features of your work. You
are strongly advised to use the “notes” section of the PowerPoint if you need to include more of your findings to be
considered when marking the project.
This assignment will be marked out of [10] according to the following guideline:
Rubrics Poor Fair Good Excellent
Project Scope
and priority
You went outside
facts of case.
Didn’t identify the
project scope. No
logical thinking
about scope check
list. Poor writing.
[1 Mark]
Project scope
details discussed
but not thoroughly
analyzed.
Understood issues
and offered a few
information.
[2 Marks]
Understood major
issues in the project
scope. Explained
the scope check list
clearly and with
enough information
[3 Marks]
Exceptional insight
into the scope check
list components &
thorough
explanation of each
point.
[4 Marks]
Work
Breakdown
Structure
WBS presented
with one or two
levels
[0.5 Mark]
WBS presented
three levels. Not
sufficient
breakdown and
details.
[1 Marks]
WBS presented in
four levels with
good details and
breakdown.
[1.5 Marks]
WBS presented
with 4 to 5 levels
with comprehensive
details and
numbering.
[2 Marks]
Responsibility
Matrix
Didn’t link
tasks/deliverables
with the right
functional
positions/functions.
Unclear tasks
and/or
deliverables.
[0.5 Mark]
Made some clear
tasks and/or
deliverables with
acceptable linkage
to functional
positions/functions.
Had some
understanding of
responsibility
matrix and selected
project.
[1 Marks]
Summed up the
tasks and/or
deliverables with
good linkage to
functional
positions/functions.
Had good of
responsibility matrix
and selected project.
[1.5 Marks]
Exceptional insights
and detailed tasks
and/or deliverables
with detailed
functional
positions/functions.
Had excellent
understanding of
responsibility
matrix and selected
project.
.[2 Marks]
Communication
Plan
Didn’t sum up the
project from
communication
point of view and
did not answer the
communication
plan basic
questions.
[0.5 Mark]
Made some efforts
to answer the
communication
plan basic
questions and
included
acceptable details
in the plan.
[1 Marks]
Summed up the
answers of the
communication plan
basic questions and
included good
details in the plan.
[1.5 Marks]
Exceptional insights
with high value
proposition
encompassing all
possible details.
[2 Marks]
This assignment will count [10] % of your final grade.
Please allow one week after due date for this assignment to be marked and returned to you, and/or your grade
to be posted in the My Grades section.
Submission Requirements
? Hard copy and through blackboard as a pdf file
? Name your file Term Assignment#1[yourname]
? Unless instructed otherwise, use Add Attachments in the Assignment Tool of Blackboard to send your
assignment to your instructor.