TPMS assignment
Project description
TPMS
This project assignment is a two page assignment. Each page must have the technical performance measure graph for a performance requirement along with a clear
explanation for (1) the initial value, (2) the transition from Phase A to Phase B, and (3) Phase B to Phase C. The definition of each phase can be found in the lecture
notes for Life Cycle Management (Module 4 – Topic 2).
Thus, pick 2 performance requirements for the given case study (and not any other case), and carry out the assignment as stated above.
USING THE ATTCHMIENT FILE PLEASE.
2
??