Order Description
.expanding preliminary report to be detailed report all based on the option that we choose which is Sugarcane Bagasse .
my part is :
III. Modifications to the factory’s Process Flow Diagram. Written and pictorial description of the changes. Modify the existing PFD, highlighting changes in red. so all changes related to the option we choose .
i’m going to upload the assessment guide , the CRA , our preliminary report and separated copy of my part .
according to the assignment guide we are doing now 1B which is Detailed engineering report .