Need help with case study “AIC Netbooks: Optimizing Product Assembly”. This is my first time using this website, and I hope it matches my expectat

BUILDING AN ETHICS-BASED WORKPLACE CULTURE
September 20, 2020
Hypotheses and Test Statistics
September 20, 2020

Need help with case study “AIC Netbooks: Optimizing Product Assembly”. This is my first time using this website, and I hope it matches my expectat

AIC Netbooks: Optimizing Product Assembly

 

Need help with case study “AIC Netbooks: Optimizing Product Assembly”.
This is my first time using this website, and I hope it matches my expectations.

I have uploaded the case study files and the guidelines for grading, please stick to them.

Compare current capacity with peak capacity? Identify ways to improve productivity of current capacity.
Quantitative Analysis: Determine what is the demand and what’s the current capacity of the line?
Should we keep floating employees?

Hint: Page 5: Key info – Notebook every 50 seconds is produced
Hint: Assembly line flow is not very smooth
Hint: Target demand: 130000 units per month

Need assistance with this?