Task information system essays
There are Eight tasks to complete in this assignment. There are 30 marks in total.
Using Packet tracer implement the following tasks based on the network topology of a small business given below. Smart Sale Pty Ltd has four departments: Sales, Production, Marketing and Management. Its Central office (HQ) controls the connection between Internet Service Provider (ISP) and one local office (R1). Examine the network requirements and complete the eight questions to make the company network service running.
You must submit your answer file in word or pdf and packet tracer file to Turnitin by the due date.
Please use your last 4 digits of your student ID as the first two octets of your network address. Keep other bits same as what are shown in the addressing table and the figure below. For example, if your student ID is 11567890, using the last 4 digits (7890). your main network address will be 78.90.0.0.
Consider the following Topology in the figure below:
Addressing Table
VLAN Table
You need to use Packet Tracer to implement the given topology and to complete the following tasks:
1. Configure four VLANs as required on S1 and enable Trunking on S1. (4 marks)
2. Configure inter-VLAN routing on R1 based on the Addressing Table. (4 marks)
3. Configure four directly attached static routes on HQ to four VLANs: 10, 20, 30 and 88. (4 marks)
4. Configure directly attached static routes on HQ to reach Outside Host. (4 marks)
a. Configure the primary path through the Serial 0/1/0 interface.
b. Configure the backup route through the Serial 0/1/1 interface with a 10 AD.
5. Configure directly attached primary and backup summary routes on ISP for the entire x.x.0.0/17 address space. (4 marks)
a. Configure the primary path through the Serial 0/1/1 interface.
b. Configure the backup route through the Serial 0/1/0 interface with 25 AD.
6. Configure a directly attached default route on R1. (2 marks)
7. Verify connectivity by making sure all the PCs can ping Outside Host (2 marks)
8. Explain and analysis the routing process of three routers in the case of ping from PC-A to Outside Host. (6 marks)