Discuss by focus in how to solve the parking issue and traffic jam issue and we will come up with the best design solution.

IB Film Independent Study
July 22, 2020
Physical Security
July 22, 2020

Discuss by focus in how to solve the parking issue and traffic jam issue and we will come up with the best design solution.

We are group of Civil Engineering students and we are working on our graduation project proposal ( Multi-story car parking building at Higher Collage of Technology Abu Dhabi men campus. I will send all the required attachments
–
Added on 04.11.2015 12:41
Rush hour time (morning and evening). (10:00 12:00) (13:30 15:30)
Entrance jam (all entrances) time + capacity. Same as above.
Number of parkings (inside and outside). 763 Inside and 230 Outside
Number of students (morning and evening) + total. 2720 Morning and 284 Evening. Total 3004
Number of staff. 392
Number of yearly students registered. 3000 students
Number of yearly students graduating. 300 students
–
Added on 04.11.2015 12:45
wikimapia.org/#lang=en&lat=24.454693&lon=54.400095&z=19&m=b
–
Added on 04.11.2015 13:08
Please follow the attached proposal guideline you can use the previous information:
1. Location map
2. design layout
3. Existing parking information.We selected the multistorey parking building for our graduation project because it is a big concern for ADMC campus. In our project we will focus in how to solve the parking issue and traffic jam issue and we will come up with the best design solution. The project will contain the following studies:General ideas about the parking issue.
Coming up with the best design solution:
1.Parking number needed.
2.Number of stories.
3.Structural design.
4.Traffic flow.
Collecting data:
1.General survey (students and stuff).
2.Current number of parkings.
3.Number of student.
4.Parking area and dimensions.
5.Underground services and utilities.
6.Future use of our selected area.
Traffic impact study and rush hours.
Department of Transportation standers and specifications.
Health and safety environmental (HSE):
1.Fire protection.
2.Ventilation.
3.Speed humps.
4.Proper intersections, entrance and exit.
5.Rump slopes.
6.Emergency safe access.
Parking usage regulation:
1.Access for authorised people.
2.Handicapped parking.
3.Security.
4.Parking time limit.
Optional regulations:
1.Requiring (SAEED).
2.Entrance students and stuff cards.
Engineering Management:
1.Cost of project.
2.No objection Certificate (NOCs) required.
3.Baseline schedule.
4.Minutes of meetings.At the end we need to find a similar problem worldwide which has been solved and to compare it with our problem and solution

+1 (786) 788-0496
Welcome to brimaxessays.com
Hello 👋
We will write your work from scratch and ensure it's plagiarism-free, you just submit the completed work.