Analyze- the team seeks the root causes of the current identified and alternatives are considered.

Identify at least one performance issue that could be contributing to the teams poor performance and at least three root causes for the performance is
July 24, 2020
Explain Culturally informed assessments.
July 24, 2020

Analyze- the team seeks the root causes of the current identified and alternatives are considered.

Quality ControlQuality control= the stabilization and maintenance of a transformation process to produce consistent outputCrocs production process:Raw materials (chemicals) purchased in pellet form
Compounding
Add color dyes
Injection molding (requires injection molding machines and molds for each style and size)
Assembled (may involve gluing or stitching if using leather, canvas or materials)
Tagged and place into boxes
Quality Control System
Inspections take place at critical points:
Before production (raw materials)
During production
-Process quality control takes place, which involves statistical process control. Periodic samples are taken from a continuous production, as long as sample measurements fall within the control limit the production will continue. However, if the samples fall outside the control limits, the process is stopped and a search is made for an assignable cause. In this case, the process will use a quality control chart known as an attribute control chart. The whole purpose is to find the natural random variability in the output oppose to unnecessary variations. The company must maintain that natural random variability to be under statistical control
After production
Process Capability
Process capability is assessed once the process is under statistical control. It is the ability of the process to meet or exceed customers specifications. Process capability is determined by using the process capability index.Continuous Improvement
Through the process capability assessment, the company can determine which processes should be improved in which case they would use several tools. The seven tools include:
Flow chart
Check sheet
Histogram
Pareto Chart
Cause & effect
Scatter diagram
Control chartThe tools make it possible to reduce defects and improve quality, but they also have to be incorporated into an improvement approach. This would be Six Sigma:
Define: a process is selected for improvement and a cross-functional team is form
Measure- with the use of measures that are critical to the customer, the team begins improvement by flowcharting the process and defining process defects
Analyze- the team seeks the root causes of the current identified and alternatives are considered
Improve- improvements are made
Control a control plan is put in place to ensure that changes are permanent